SYRIA PROJECT 2x 12M3/HOUR CAPACITY CONTAINERIZED BRACKISH WATER RO  SYSTEM

SYRIA PROJECT 2x 12M3/HOUR CAPACITY CONTAINERIZED BRACKISH WATER RO SYSTEM

SYRIA PROJECT: We started to manufacture 2 pcs,  12 m3/h BWRO System with pre-treatment and feed pump set inside 40 ft Container (refurnished, isolation, air conditioner, with all required piping and cabling inside container) on 3rd of January 2025.  

300m3/day Seawater RO

300m3/day Seawater RO

We started the production of Seawater RO system for the order we get from Belize, South America. The capacity of the system will be 300m3/day. System is in production period, planning to be tested on 7th of March 2025

20 M3/HOUR CAPACITY PACKAGE WATER TREATMENT SYSTEM

20 M3/HOUR CAPACITY PACKAGE WATER TREATMENT SYSTEM

We have started the production of 20 m3/hour capacity Package Water Treatment System for Cameroon Customer in last week. System will be installed inside a wine factory. Production period will be 6 weeks.

30m3/day capacity industrial MBBR wastewater treatment plant

30m3/day capacity industrial MBBR wastewater treatment plant

30m3/day capacity industrial MBBR wastewater treatment plant production for wine factory at Cameroon finished at our workshop, SGS inspeciton test results are waiting for loading.

2x150 m3/day Capacity MBBR System

2x150 m3/day Capacity MBBR System

Goods loaded on 19th of September 2023 as 3 containers. 2x150m3/day capacity MBBR System installation started on 21st of October at Janzour touristic village in Tripoli, Libya

2 x 25 m3/hour capacity Containerized Reverse Osmosis System

2 x 25 m3/hour capacity Containerized Reverse Osmosis System

We have finished 2 x 25 m3/hour capacity Containerized Reverse Osmosis Systems order production. Goods  loaded  to Qamishli, Syria.

SAND FILTERS, ACTIVE CARBON FILTERS

SAND FILTERS, ACTIVE CARBON FILTERS

We finished 700x2200 mm Sand Filters and 1100x2200 mm Activated Carbon Filters order for our Hungary Project on 25th of March 2022

10m3 air pressure tank

10m3 air pressure tank

We have finished 10 m3  capacity air pressure tank  order's production in this week. Goods  loaded  to Baghdad / Iraq.

 

3000m3/hour capacity horizontal sand filters Najaf/ Iraq Project

3000m3/hour capacity horizontal sand filters Najaf/ Iraq Project

We started the Project on 5th of March 2020, we loaded the goods at three party. Last party loaded on 22nd of September 2021.